Cms.walsall.gov.uk
WINDOW BOARDS Carefully remove existing window board and dispose off site. Circular plastic ventilator or the like (drilling glass measured separately) Flexible flooring, Altro Marine 20 safety waterproof, non-slip ... Fetch Document
Www.westberks.gov.uk
Provide and lay altro flooring and coved skirting over kitchen tiles. Replace library door and fixed glazing over with PVCU double glazing. Replace corrugated plastic sheeting over oil tank. ... Fetch Here
Www.source-development.co.uk
The Client therefore requires absolute certainty over the handover date. Lifts Slip resistant vinyl flooring unless carpeting has been specifically requested Impact protection for door and car to avoid wheelchair fascias and soffits are to be constructed of white PVCu boarding. ... Doc Retrieval
All roads shall be clearly signed and the Constructor is to provide suitable name boards and directional on the implications for the Code for Sustainable Home requirements fascias and soffits are to be constructed of white PVCu Slip resistant sheet flooring e.g. vinyl or ... Fetch Document
Constructionline And NPQS Sectors And Categories
45432120-1 Flooring (Rubber, Plastic, Cork, Lino And 45421000-4 Joinery (Second Fix) Installation of 2nd fix woodwork on such as skirting, doors etc in new and Supply and installation or installation PVCU-framed windows. Installation of plastic windows. 45421132-8 Windows ... Access Doc
Www.amgriffiths.co.uk
The outer frame is to be minimum 70mm and fully reinforced in white PVCu or similar with a low profile cill in a range of sizes to be confirmed at Skirting and architraves shall be to B.S Consideration shall also be given to Thermal effects on cables within the loft space ... View Document
Aicpwdea.com
Loft Insulation 200mm Loft Roll >Ideal for all general building use</li><li>Can be combined with cement and water to make concrete</li><li>Supplied in plastic packaging and can be stored outside without wastage</li <ul><p class=`invtdesc2`> </p><p class=`invtdesc1`><ul><li>To mount ... Fetch Here
LEICESTER CITY COUNCIL
The Contractor is responsible for ensuring that excavations over 2m deep are to be inspected before the start of every shift and thoroughly Carefully remove all skirting boards within room & dispose ensuring no damage to Re-fit PVCu door and frame to opening, fixed through frame ... Access Full Source
Www.zen9607.zen.co.uk
Renew clear plastic 213007 sheeting:renew coloured plastic 213009 sheeting:renew translucent flooring:renew wood block over 2.0sm 307101 cladding:renew 19mm shiplap ne 2.0sm renew with pvcu casement over 3sm-3no 313613 window:renew with pvcu casement 1.5-3.0sm-4no ... Return Doc
No comments:
Post a Comment